或者

上海珩渥检测技术服务有限公司

检测认证人脉交流通讯录
  • 大众试验标准

  • 这真不是您需要的服务?

     直接提问 | 回首页搜

  • 对应法规:VW 80101
    CNAS认可项目:是
  •  

    Test item 测试名称: Electrical and Electronic Assemblies in Motor Vehicles 大众试验标准

     

    Test info 测试内容:

    No. Test info Test Method and Standard
    1 Operating Voltages VW80101 3.1
    2 Conditioning VW80101 5.1.1
    3 Drop Test VW80101 4.3
    4 Low-Temperature Operation VW80101 5.1.2
    5 Mechanical Shock Test for Systems/Components on the Body VW80101 4.2.2
    6 Temperature Cycle with Specified rate of Change VW80101 5.2.1
    7 Breakdown Strength VW80101 3.16
    8 Insulation Resistance VW80101 3.17
    9 Testing of Body-Mounted Parts VW80101 4.1.4
    10 Endurance testinf of electrical and electronic systems/components  VW80101 7.1
    11 Thermal Shock Test VW80101 5.2.2
    12 Component-Specific Endurance Testing VW80101 7.3
    13 Pull-Out Strength VW80101 4.6
    14 Resistance to Chemical Agents VW80101 6.1
    15 Multi-Stage Temperature Test VW80101 5.3
    16 Voltage Level: HIGH/LOW/Status Assignments VW80101 3.3
    17 Superimposed Alternating Voltage VW80101 3.12
    18 Operating Current VW80101 3.6
    19 Sealing against Dust and Spray Water VW80101 5.5.1
    20 Moist Heat, Cyclic VW80101 5.5.3
    21 Salt Spray Fog VW80101 5.5.4
    22 Reset Behavior at Voltage Dip VW80101 3.14
    23 Slow Decrease and Increase of the Supply Voltage VW80101 3.13
    24 Mechanical Switches and Contacts VW80101 3.9.1
    25 Electronic Outputs VW80101 3.9.2
    26 Function during Undervoltage and Overvoltage VW80101 3.5
    27 Overvoltage Protection during Long-term Operation VW80101 3.10
    28 Overvoltage Resistance during Short-term Operation VW80101 3.11
    29 Reverse-Polarity Protection VW80101 3.8
    30 Short-circuit protection VW80101 3.15
    31 Insensitivity to Shunt Audit Erpr. LAH Chapt. 2.6.25
    32 Interruptions VW80101 3.18
    33 Interference Transient Emission of Supply Line VW80101 3.20.1.1
    34 Interference Emission, conducted VW80101 3.20.2
    35 Interference Immunity of Sensor Cable VW80101 3.20.1.3
    36 Interference Immunity of Supply Lines VW80101 3.20.1.2
    37 Radiated Interference  VW80101 3.20.3
    38 Interference Emission - Radiated Radio Frequency Emission VW80101 3.20.2
    39 Immunity to Electro-static Discharges VW80101 3.20.4
    40 Operating Voltage Dip  VW80101 3.2
    41 Momentary Voltage Dips Erpr. LAH Chapt. 2.6.23
    42 Evidence of Thermal Performance Audit Erpr. LAH Chapt. 2.8.14

     

     

    Sample size 送样规格:on request

     

    Lead time 测试周期: 常规 Regular 30 working days

     

    Others 其他信息:


  • 检测通手机版

  • 检测通官方微信

  •  检测通QQ群